Register Sign in
  • About
  • Program
    • Activities
    • Industry-Education Integration
    • Regular Activities
    • Projects
    • Courses
    • Standard Programs
    • Flagship Courses
  • Resource
    • Textbook
    • Expert
  • News
  • Partner
  • Contact Us
CATECP HOME

About

Activities

  • Industry-Education Integration
  • Regular Activities

Projects

  • Courses
  • Standard Programs
  • Flagship Courses

Resource

  • Textbook
  • Expert

News

Partner

Contact

Register Sign in
< [Hydraulic Engineering Construction] 1.Hydraulic Engineering Surveying
1.1 Principle of leveling and level gauge + 1.2 The Layout Forms of the Leveling Route + 1.3 The Conduct of Leveling + 1.4 The Inner Calculation of Closed Route + 2.1 Placement of theodolites+ 3.1 Horizontal Distance Measurement + 4.1 Several concepts of control measurements + 4.2 Elevation control survey + 5.1 Polar coordinate method + 5.2 The lofting of the known elevation + 5.3 Setting out of grade lines+

Please log in and play

5.4 Lofting of the principle point of a circular curves +

TEL:+855 99 294 999

FAX:+855 99 294 999

E-MAIL:catecp@china-asean.cn