Register Sign in
  • About
  • Program
    • Activities
    • Industry-Education Integration
    • Regular Activities
    • Projects
    • Courses
    • Standard Programs
    • Flagship Courses
  • Resource
    • Textbook
    • Expert
  • News
  • Partner
  • Contact Us
CATECP HOME

About

Activities

  • Industry-Education Integration
  • Regular Activities

Projects

  • Courses
  • Standard Programs
  • Flagship Courses

Resource

  • Textbook
  • Expert

News

Partner

Contact

Register Sign in
< [Power Transmission and Distribution Engineering Technology] 3.Operation and Maintenance of Distribution Lines
1.1 Awareness of overhead distribution lines+ 1.2 Recognition of distribution equipment+ 1.3 Recognition of Power Cable Lines+

Please log in and play

2.1 Distribution line inspection+ 2.2 Ring main unit from operation to maintenance operation+ 2.3 Distribution transformer grounding resistance measurement+ 2.4 Measurement of insulation resistance of 10kV power cables+ 3.1 Installation and removal of a set of 10kV line grounding wire operation+ 3.2 Replacement of 10kV overhead line linear pole side phase insulators+ 3.3 Fabrication and installation of GJ-35 tie wire+ 4.1 Replacement of Linear Pole Side Phase Insulators by the Insulated Glove Method - Saf+ 4.2 Replacement of Linear Pole Side Phase Insulators by the Insulated Glove Method with + 4.3 Replacement of Linear Pole Side Phase Insulators by the Insulated Glove Method - Pre+ 4.4 Replacement of Linear Pole Side Phase Insulators by the Insulated Glove Method with + 4.5 Insulation method of electrically lapping leads (1)+ 4.5 Insulation method of electrically lapping leads (2)+

TEL:+855 99 294 999

FAX:+855 99 294 999

E-MAIL:catecp@china-asean.cn