General Introduction
This course focuses on developing students’ core ability to prepare construction plans for small- and medium-sized water conservancy projects. It primarily covers the fundamental theories and practical
techniques of hydraulic structure construction, laying a solid foundation for future careers in water conservancy engineering construction and construction management of international engineering projects.

This Course is for
1. Helping trainees understand the fundamental principles of water conservancy engineering construction and the performance characteristics of commonly used construction machinery.
2. Equipping trainees with knowledge of construction procedures, methods, and technical requirements for various types of construction work.
3. Enabling trainees to master the methods and procedures for preparing construction plans for major hydraulic structures.
4. Laying the necessary foundation for future careers in water conservancy engineering construction and construction management of international engineering projects.

Learning Materials

1. Corresponding PPT
2. Online Course Video
3. Simulation Question Bank

Recognized By

Benefits of Learning

1. Understanding the safety operating procedures for water conservancy engineering construction, prioritizing quality and safety at all times, and being able to promptly identify and eliminate potential safety hazards during construction.
2. Being able to carry out construction operations in accordance with current water conservancy construction standards, design drawings, and operating procedures, while developing the habit of conducting construction acceptance inspections in compliance with relevant standards.
3. Being able to consult technical manuals and standards proactively and collaborate with team members to develop solutions to technical problems such as seepage and cracking during construction.
4. Being able to adapt to challenging working conditions, including winter and rainy-season construction, remain committed to assigned duties, and demonstrate resilience and a strong work ethic.
5. Understanding the importance of fulfilling job responsibilities, taking a conscientious approach to every construction procedure, and demonstrating professionalism and dedication.

Courses Videos
1.1 Methods of Construction Diversion.mp4play1.2 Determination of Design Diversion Discharge.mp4play1.3 Cofferdam Engineering.mp4play1.4 Basic Methods of River Closure.mp4play1.5 Determination of Closure Time and Design Discharge.mp4play1.6 Closure Materials and Hydraulic Calculation of Closure.mp4play1.7 Initial Dewatering of Foundation Pit.mp4play1.8 Regular Dewatering of Foundation Pit.mp4play2.1 Basic Principles of Blasting.mp4play2.2 Calculation of Explosives and Charge Quantity.mp4play2.3 Basic Methods of Blasting.mp4play2.4 Blasting Drilling Tools.mp4play2.5 Initiation Equipment and Initiation Methods.mp4play2.6 Special Blasting Techniques.mp4play2.7 Blasting Safety Control.mp4play3.1 Classification of Grouting.mp4play3.2 Grouting of Gravel Foundation.mp4play3.3 Grouting of Rock Foundation.mp4play3.4 High-Pressure Jet Grouting.mp4play3.5 Concrete Cut-off Wall.mp4play3.6 Concept and Classification of Pile Foundations.mp4play3.7 Construction of Precast Concrete Piles.mp4play3.8 Construction of Cast-in-place Concrete Piles.mp4play4.1 Overview of Earth-rock Dam Construction.mp4play4.2 Planning of Earth-rock Material Sites.mp4play4.3 Engineering Properties of Soil.mp4play4.4 Earth Excavation.mp4play4.5 Excavation and Transportation Scheme of Earth-rock Materials.mp4play4.6 Compaction Test.mp4play4.7 Rolling Machinery.mp4play4.8 Filling Construction of Earth-rock Dam.mp4play4.9 Quality Control of Rolled Earth-rock Dam Construction.mp4play4.10 Rockfill Quality Requirements and Zoning of Concrete Face Rockfill Dam.mp4play4.11 Rockfill Placement.mp4play4.12 Construction of Concrete Plinth and Face Slab.mp4play4.13 Winter and Rainy Season Construction of Earth-rock Dam.mp4play5.1 Planning and On-site Processing of Aggregate Material Sites.mp4play5.2 Formwork Engineering.mp4play5.3 Steel Bar Delivery and Proportioning.mp4play5.4 Steel Bar Processing and Installation.mp4play5.5 Concrete Production.mp4play5.6 Concrete Transportation.mp4play5.7 Concrete Pouring and Curing.mp4play6.1 Construction of Spur Dike for Deflecting Flow.mp4play6.2 Ecological Revetment (Slope) Construction.mp4play7.1 Introduction to Intelligent Construction Technology for Water Conservancy Engineering.mp4play7.2 Intelligent Grouting Technology.mp4play7.3 Intelligent Temperature Control Technology.mp4play7.4 Intelligent Rolling Technology.mp4play