Register
Sign in
About
Program
Lecture
Webinar
Sharing Meeting
Youth Talk
Projects
Courses
Standard Programs
Flagship Courses
Resource
Textbook
Expert
Studying in China
News
News
Industry-Education Integration
Regular Activities
Partner
Contact Us
CATECP HOME
About
Lecture
Webinar
Sharing Meeting
Youth Talk
Projects
Courses
Standard Programs
Flagship Courses
Resource
Textbook
Expert
Studying in China
News
News
Industry-Education Integration
Regular Activities
Partner
Contact
Register
Sign in
< [Water Conservancy Engineering Construction Technology] 1.Water Conservancy Engineering Construction Technology
1.1 Methods of Construction Diversion.mp4
+
1.2 Determination of Design Diversion Discharge.mp4
+
1.3 Cofferdam Engineering.mp4
+
1.4 Basic Methods of River Closure.mp4
+
1.5 Determination of Closure Time and Design Discharge.mp4
+
1.6 Closure Materials and Hydraulic Calculation of Closure.mp4
+
1.7 Initial Dewatering of Foundation Pit.mp4
+
1.8 Regular Dewatering of Foundation Pit.mp4
+
2.1 Basic Principles of Blasting.mp4
+
2.2 Calculation of Explosives and Charge Quantity.mp4
+
Please log in and play
2.3 Basic Methods of Blasting.mp4
+
2.4 Blasting Drilling Tools.mp4
+
2.5 Initiation Equipment and Initiation Methods.mp4
+
2.6 Special Blasting Techniques.mp4
+
2.7 Blasting Safety Control.mp4
+
3.1 Classification of Grouting.mp4
+
3.2 Grouting of Gravel Foundation.mp4
+
3.3 Grouting of Rock Foundation.mp4
+
3.4 High-Pressure Jet Grouting.mp4
+
3.5 Concrete Cut-off Wall.mp4
+
3.6 Concept and Classification of Pile Foundations.mp4
+
3.7 Construction of Precast Concrete Piles.mp4
+
3.8 Construction of Cast-in-place Concrete Piles.mp4
+
4.1 Overview of Earth-rock Dam Construction.mp4
+
4.2 Planning of Earth-rock Material Sites.mp4
+
4.3 Engineering Properties of Soil.mp4
+
4.4 Earth Excavation.mp4
+
4.5 Excavation and Transportation Scheme of Earth-rock Materials.mp4
+
4.6 Compaction Test.mp4
+
4.7 Rolling Machinery.mp4
+
4.8 Filling Construction of Earth-rock Dam.mp4
+
4.9 Quality Control of Rolled Earth-rock Dam Construction.mp4
+
4.10 Rockfill Quality Requirements and Zoning of Concrete Face Rockfill Dam.mp4
+
4.11 Rockfill Placement.mp4
+
4.12 Construction of Concrete Plinth and Face Slab.mp4
+
4.13 Winter and Rainy Season Construction of Earth-rock Dam.mp4
+
5.1 Planning and On-site Processing of Aggregate Material Sites.mp4
+
5.2 Formwork Engineering.mp4
+
5.3 Steel Bar Delivery and Proportioning.mp4
+
5.4 Steel Bar Processing and Installation.mp4
+
5.5 Concrete Production.mp4
+
5.6 Concrete Transportation.mp4
+
5.7 Concrete Pouring and Curing.mp4
+
6.1 Construction of Spur Dike for Deflecting Flow.mp4
+
6.2 Ecological Revetment (Slope) Construction.mp4
+
7.1 Introduction to Intelligent Construction Technology for Water Conservancy Engineering.mp4
+
7.2 Intelligent Grouting Technology.mp4
+
7.3 Intelligent Temperature Control Technology.mp4
+
7.4 Intelligent Rolling Technology.mp4
+