Register Sign in
  • About
  • Program
    • Lecture
    • Webinar
    • Sharing Meeting
    • Youth Talk
    • Projects
    • Courses
    • Standard Programs
    • Flagship Courses
  • Resource
    • Textbook
    • Expert
    • Studying in China
  • News
    • News
    • Industry-Education Integration
    • Regular Activities
  • Partner
  • Contact Us
CATECP HOME

About

Lecture

  • Webinar
  • Sharing Meeting
  • Youth Talk

Projects

  • Courses
  • Standard Programs
  • Flagship Courses

Resource

  • Textbook
  • Expert
  • Studying in China

News

  • News
  • Industry-Education Integration
  • Regular Activities

Partner

Contact

Register Sign in
< [Construction Engineering Technology] 1.Subgrade and Foundation Construction
1.1 Introduction.mp4+ 1.2 Origin and Composition of Soil.mp4+ 1.3 Engineering Classification and Identification of Soil.mp4+ 1.4 Building Axis Survey and Allowable Foundation Settlement.mp4+ 1.5 Purposes and Tasks of Engineering Geological Investigation.mp4+ 2.1 Earthwork Volume Calculation through Grid Method.mp4+ 2.2 Cross-section Method and Earthwork Allocation Principles.mp4+ 2.3 Earthwork Excavation.mp4+ 2.4 Earthwork Backfilling.mp4+ 3.1 Overview of Strip Foundations.mp4+ 3.2 Structural Requirements of Reinforced Concrete Strip Foundations Under Walls.mp4+ 3.3 Structural Requirements of Reinforced Concrete Strip Foundations Under Columns.mp4+ 3.4 Construction of Strip Foundations with Beams.mp4+ 3.5 Overview and Structural Requirements of Isolated Foundations.mp4+

Please log in and play

3.6 Understanding Raft Foundations.mp4+ 4.1 Introduction, Functions, and Classification of Pile Foundations.mp4+ 4.2 Overview of Cast-in-Place Piles.mp4+ 4.3 Overview of Prefabricated Piles.mp4+ 4.4 Prefabricated Pile Hammering Method Construction.mp4+ 5.1 Introduction and Replacement Fill Method Construction.mp4+ 5.2 Construction of Dynamic Consolidation.mp4+ 5.3 Engineering Construction of Drainage Consolidation Preloading Method.mp4+ 6.1 1+x Construction Process Implementation.mp4+ 6.2 1+X Construction Process Implementation.mp4+ 6.3 1+x Construction Process Implementation.mp4+

TEL:+855 99 294 999

FAX:+855 99 294 999

E-MAIL:catecp@china-asean.cn